在线翻译
接口调用 意见/报错
登录 / 注册
在线翻译

在线翻译

中密度纤维板项目发展迅速,其带来的环境污染问题也不容忽视.. 翻译

原文(简体中文):
中密度纤维板项目发展迅速,其带来的环境污染问题也不容忽视。该类项目的环境影响评价是根据项目的特点从各个生产环节识别其环境影响,提出合理的污染防治措施;并根据评价标准,对该项目所在地的地表水、大气、噪声、固废、生态进行检测来确定评价级别,并确定可能带来的主要环境问题,其中有生活污水对地表水的影响,燃木质废料和燃煤锅炉烟气对环境空气的影响;各种设备对声环境的影响;各种固废物对周围环境的影响;消耗林业资源对生态环境的影响;新建企业制胶及粉尘的火灾、爆炸等风险。根据新建项目的工程特点,排污地点和所在区域环境现状,以工程分析为基础,以地表水环境影响分析评价、大气环境影响评价、风险评价及污染防治措施及建议为评价工作重点,研究分析该项目是否符合国家产业政策和环保相关要求。
翻译结果(英语)1:
The rapid development of medium density fiberboard projects, it brings the problem of environmental pollution can not be ignored. Type of the project's environmental impact assessment is to identify the environmental impact from the various production processes according to the characteristics of the project, a reasonable pollution prevention measures; and in accordance with the evaluation criteria, the project site surface water, air, noise, solid waste, ecological tests to determine the assessment level, and to identify potential environmental problems, including the impact of domestic sewage to surface water, the burning of wood waste and coal-fired boiler flue gas to ambient air; a variety of devices on the acoustic environment; a variety of solid waste on the surrounding environment;Consumption of forestry resources on the ecological environment; risk of fire, explosion and other new enterprises, glue and dust. According to the engineering characteristics of the new projects, sewage disposal sites and the region state of the environment, engineering analysis to evaluate the environmental impact of surface water, atmospheric environmental impact assessment, risk assessment and pollution control measures and recommendations for the evaluation of priorities, research and analysis of the The project is in line with national industrial policies and environmental requirements.

翻译结果(英语)2:
MDF project is developing rapidly, its environmental issues cannot be ignored. The class project of environment effect evaluation is under project of features from all production links recognition its environment effect, made reasonable of pollution control measures; and under evaluation standard, on the project location of surface water, and atmospheric, and noise, and solid waste, and ecological for detection to determines evaluation level, and determines may brings of main environment problem, which has life sewage on surface water of effect, burning wood mass waste and coal-fired boiler flue gas on environment air of effect; various device on sound environment of effect; various solid waste on around environment of effect;Forestry resource-depleting effect on ecological environment in; new enterprises of natural rubber and dust risks such as fire, explosion. According to the characteristics of the new project, where sewage stations and regional environment, project based on analysis, analysis and evaluation of environmental impacts to surface water, atmospheric environmental impact assessment, risk assessment and pollution prevention and control measures, and recommendations for the evaluation focus, research and analysis that the project is in line with the State's industrial policy and environmental requirements.

翻译结果(英语)3:
Medium density fiberboard project development is rapid, its brings pollution problem also nots allow to ignore. The project of environmental impact assessment according to the characteristics of the project is from all production processes to identify the environmental impact, this paper puts forward reasonable pollution prevention measures; And according to the evaluation standard, the project is located on the surface water and air,Noise, solid waste, ecological testing to determine the level of evaluation, and sure can bring the main environmental problems, including sewage the influence of the surface, burning wood waste and coal boiler flue gas to the influence of the environmental air; All sorts of equipment of the acoustic environment influence; All kinds of solid waste impact to surrounding environment;Consumption forestry resources on the ecological environment of influence; New enterprise system of plastic and dust of fire, explosion risks. According to the new project engineering characteristics, the drainage area place and the status quo environment to engineering analysis is the base and surface water environment impact analysis and evaluation, atmospheric environment impact assessment,Risk assessment and pollution control measures and Suggestions for the evaluation emphases, the analysis of the program is not in conformity with the state industrial policy and environmental requirements.





欢迎关注微信公众号:诚华便民查询

1、长按上方二维码,保存至手机相册;
2、进微信扫一扫,从相册中选择识别二维码。
联系我们
接口调用 | 联系我们
CopyRight © 2004-2025 便民查询网 All Rights Reserved
闽ICP备2020022420号-1 闽B2-20210351
闽公网安备 35011102350673号