在线翻译
接口调用 意见/报错
登录 / 注册
在线翻译

在线翻译

在线翻译汉字拼音转换汉字笔画查询在线组词近义词反义词计算题大全

因此,在新建光缆线路、开通长距离系统、在现有光缆线路升级.. 翻译

原文(简体中文):
因此,在新建光缆线路、开通长距离系统、在现有光缆线路升级系统等情况时,必须测量PMD值。网络规划者在设计链路时最有效的方法是:通过现场实地测量光缆链路的PMD值 更多:https://www.bmcx.com/ ,在此基础上充分考虑PMD的影响,预留足够的PMD富余度。
翻译结果(英语)1:
Therefore, in the new fiber optic lines, the opening of the long-distance system 更多:https://www.bmcx.com/ , pmd value of existing fiber optic lines to upgrade the system must be measured. The most effective way to network planners in the design of link: pmd value through on-site field measurement of fiber optic cable link on this basis, give full consideration to the pmd impact of reserve sufficient the pmd surplus of.

翻译结果(英语)2:
Therefore, opening new cable lines, long distance systems, when the situations 更多:https://www.bmcx.com/ , such as the upgrading of existing cable lines, you must measure PMD value. Network planners when designing link is the most effective method: PMD for fiber optic cable link through the site measurement values, fully consider the effects of PMD on this basis, set aside sufficient surplus of PMD.

翻译结果(英语)3:
Therefore, in the new fiber optic cable line, opened in the existing system, long fiber optic cable line upgrade system, etc 更多:https://www.bmcx.com/ , must be PMD value measurement. Network planners in the design when link are the most effective ways: through in-situ measurement value of fibre links PMD, and based on this, the influence of full consideration PMD,Reserve enough PMD surplus degrees.





欢迎关注微信公众号:诚华便民查询

1、长按上方二维码,保存至手机相册;
2、进微信扫一扫,从相册中选择识别二维码。
联系我们
接口调用 | 联系我们
CopyRight © 2004-2024 便民查询网 All Rights Reserved
闽ICP备2020022420号-1 闽B2-20210351
闽公网安备 35011102350673号