在线翻译
接口调用 意见/报错
登录 / 注册
在线翻译

在线翻译

在线翻译汉字拼音转换汉字笔画查询在线组词近义词反义词计算题大全

本文在研究我国全面质量管理存在的问题的基础上,从质量计划.. 翻译

原文(简体中文):
本文在研究我国全面质量管理存在的问题的基础上,从质量计划的编制(包括建立工作分解结构、代码与编码的编制、确定衡量尺度)、质量保证(包括相关概念体系建立及审核、监察和责任制的制定等)、质量控制(影响质量的因素比较多:人、机械设备、材料构配件、施工方法、环境、工序施工的顺序及成品的保护的相关对策)三个方面,对如何提高我国建筑施工质量管理进行了初步的研究,提出了一些新的概念及相应的措施以强化建筑施工项目全过程的质量监控 更多:https://www.bmcx.com/ ,通过采用文献查询和实际工程调研相结合的方法,在借鉴前人研究成果的基础上,结合实际工程编制建筑施工质量管理的文件,从而解决目前我国建筑施工质量管理中存在的各种问题。
翻译结果(英语)1:
On the basis of the study of the overall quality management problems in the quality plan (including the establishment of a work breakdown structure, the preparation of the code and coding, to determine the measure), quality assurance (including the related concept system and audit, monitoring and The responsibility system for the formulation, etc.), quality control (affecting the quality of many factors: people, machinery and equipment, materials 更多:https://www.bmcx.com/ , components and parts, construction methods, the environment, the order of the process of construction and the finished product protection countermeasures) three aspects of how to improve The construction quality management in China carried out a preliminary study,Some new concepts and corresponding measures to strengthen the whole process of the construction project quality control, a combination of methods through the use of search and practical engineering research, on the basis of previous research results, combined with practical engineering preparation of construction quality management of documents, so as to solve the various problems in China's construction quality management.

翻译结果(英语)2:
This in research in China full quality management exists of problem of Foundation Shang, from quality plans of prepared (including established work decomposition structure, and code and coding of prepared, and determines measure scale), and quality guarantee (including related concept system established and the audit, and monitored and accountability of developed,), and quality control (effect quality of factors comparison more: people, and machinery device, and material frame accessories, and construction method, and environment, and process construction of order and the finished of protection of related countermeasures) three a area, On how to improve our quality management conducted a preliminary study of building construction,This in research in China full quality management exists of problem of Foundation Shang, from quality plans of prepared (including established work decomposition structure, and code and coding of prepared 更多:https://www.bmcx.com/ , and determines measure scale), and quality guarantee (including related concept system established and the audit, and monitored and accountability of developed,), and quality control (effect quality of factors comparison more: people, and machinery device, and material frame accessories, and construction method, and environment, and process construction of order and the finished of protection of related countermeasures) three a area, On how to improve our quality management conducted a preliminary study of building construction,Put forward a number of new concepts and the corresponding measures to strengthen the quality control of the construction project, queries through the use of literature and practical engineering investigation method of combining, in reference to the predecessors on the basis of the outcome of the study, combining engineering preparation of construction quality management of documents, so as to resolve the current problems in construction quality management in our country.

翻译结果(英语)3:
Based on the study of total quality management in China based on existing problems, from the quality plan (including the establishment of a work breakdown structure, code and coding, definite measure of scale), quality assurance (including the related concept system is set up and audit, surveillance and responsibility system establishment),Based on the study of total quality management in China based on existing problems, from the quality plan (including the establishment of a work breakdown structure, code and coding, definite measure of scale), quality assurance (including the related concept system is set up and audit, surveillance and responsibility system establishment),Quality control (influence factors on the quality of the more: people 更多:https://www.bmcx.com/ , mechanical equipment, materials, components, construction method, environment, the order of the construction process and product of the protection of the relevant countermeasures) three aspects, on how to improve our country building, the construction quality management of preliminary studies,Put forward some new concepts and the corresponding measures to strengthen the construction of the whole project quality control, and through the literature search and actual engineering research method of combining the, in reference to previous research results on the basis of the practical engineering construction quality management of the documents,To solve our construction quality management exist in the various issues.





欢迎关注微信公众号:诚华便民查询

1、长按上方二维码,保存至手机相册;
2、进微信扫一扫,从相册中选择识别二维码。
联系我们
接口调用 | 联系我们
CopyRight © 2004-2024 便民查询网 All Rights Reserved
闽ICP备2020022420号-1 闽B2-20210351
闽公网安备 35011102350673号